Remodeling Case Studies: Half Bath Built and Basement was Finished in a Home in Leavenworth, KS

Friday, May 14th, 2021 by James Bohon

Challenge

A customer in Leavenworth, KS had a basement that they needed to have finished. They also wanted to have a half bath in the basement built.

Solution

In the basement area, Arrow Renovation framed, put up drywall and painted the walls to have a recreational area. We created a half bath and two storage areas. The bathroom had a bath fan installed and a new standard vanity faucet. A standard vanity combo top installed, 24" wide and a new comfort height white toilet was put in. New standard 6 panel doors were installed into the bathroom, small storage area and the door leading into the larger storage area will need to be 36" wide with louvers in the lower section for air flow. New PVC style flooring was laid down.